Design and Practice of a Full Process Management System for Steel Bar Materials Based on Digital Technology
(China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, China)
Abstract
To solve the problem of traditional steel bar cutting relying on manual labor and high losses, a steel bar material management system is specially designed to promote the digital transformation of infrastructure. The system is built on an integrated architecture of software, hardware, and algorithms. Through modules such as demand material list management, raw material management, and cutting scheme optimization, it achieves full-process control of steel bar data, automatic generation of optimal solutions, and automatic control of cutting operations. Through the application verification of China Railway projects, the system can significantly reduce steel bar loss rates to below 3%, directly cutting construction costs, and achieve data traceability, providing feasible technical solutions for the digital transformation of building steel bar management.
Keywords
steel bar; infrastructure; intelligentization; system
References
- [1] Zhao Xu, Wang Yuntian, Liang Ce, etc Design and Application of BIM based Reinforcement Processing Management System for Beam Yard [J]. Railway Computer Application, 2024, 33 (9): 22-26
- [2] Wang Hui, Ming Lei, Fu Jun, etc Innovation and Practice of BIM Intelligent Folding Technology for Reinforcement in Building Construction Projects [J]. Construction Technology, 2019, 48 (4): 70-72
- [3] Wu Lili, Lu Xianrui, Liu Yanru Research on Information Transmission between Reinforcement Design Data and Intelligent Devices Based on BIM [J]. Railway Building Technology, 2024 (12): 120-124
- [4] Li Yan, Guo Jiacheng, Feng Xiaofeng, etc Research on the Whole Life Cycle Cost Management of Power Transmission and Transformation Projects Based on BIM Technology under the Background of Smart Infrastructure [J]. Building Economics, 2022, 43 (10): 58-65
- [5] Peng Minglei, Gu Xin, He Junwei Research and Application of Digital Ecological Control System for Reinforcement Materials [J]. Building Technology, 2024, 55 (19): 2366-2369
- [6] Zhu Dongfei, Chen Gaowei, Military Commission Zhang, etc Research on Fine Calculation Method of Reinforcement Engineering Quantity Based on BIM Technology [J]. Adhesive, 2022, 49 (2): 157-163
- [7] Zheng Hehui, Fang Zheng, Ding Zixian, etc Research on the Standardization and Digitization Design Method of Steel Reinforcement Parts for Segmental Prefabricated Box Beams [J]. Railway Standard Design, 2026, 70 (3): 100-16116
- [8] Tu Tongheng, Zhu Mingqing, Li Dongdong, etc Multi objective optimization of steel bar cutting based on integer programming [J]. Building Economics, 2023, 44 (S2): 529-533
- [9] Chen Yan, Liu Qiupeng, Hu Xiaochun Improving dynamic programming algorithm to solve the packing problem of items of the same size [J]. Mechanical Design and Manufacturing, 2024 (9): 125-129135
- [10] Chen Bin, Yan De, Song Linsong, etc Design of Rapid Retrieval Program for Semi submersible Drilling Platform Equipment Based on Django Framework [J]. Journal of Marine Technology, 2024, 43 (4): 114-120
Funding
China Railway (Practical 2023 Key 05)
About the authors
Tan Guanhua (1993-), male, Han ethnicity, from Chenzhou, Hunan, engineer, master's degree, research direction: railway signaling, urban rail transit informatization; Wang Zheng (1990-), male, Han ethnicity, born in Nanchang, Jiangxi Province, is a senior engineer with a master's degree. His research focuses on the digitization, intelligence, and intelligence of urban rail transit; Fan Qi (1990-), male, Han ethnicity, from Changzhou, Jiangsu, is a senior engineer with a master's degree. His research focuses on the digitization, intelligence, and intelligence of urban rail transit.